A comprehensive framework for evaluating bridge project rework through earned value management (EVM) and building information modeling (BIM)
S
Sara M. Elseufy
A
Ayman Hussein
(Cleveland Clinic, Cleveland)
M
Mohamed Badawy
(Division of Pediatric Emergency Medicine, Department of Pediatrics, University of Texas Southwestern Medical Center, Children’s Medical Center, Dallas)
Article Details
Journal
Scientific Reports
Volume / Issue
Vol. 16, Issue 1
Published
February 14, 2026
ISSN
2045-2322
Publisher
Nature Portfolio
Authors (3)
S
Sara M. Elseufy
A
Ayman Hussein
Cleveland Clinic, Cleveland
M
Mohamed Badawy
Division of Pediatric Emergency Medicine, Department of Pediatrics, University of Texas Southwestern Medical Center, Children’s Medical Center, Dallas
Related Articles from this Journal
AI models of unstable flow exhibit hallucination
Ramdhan Wibawa, Birendra Jha
Aug 2026
10.1038/s41598-026-64023-8
The MCAA-YOLO + XPBI integrated model provides a hybrid intelligent measurement method for predicting the body weight of Hu sheep
Hang Zhang, Yuang Cheng et al.
Aug 2026
10.1038/s41598-026-64075-w
Application of iron nano-biofertilizers as a sustainable approach to enhance growth and micronutrient uptake in soybean
Ava Mohrazi, Reza Ghasemi-Fasaei
Aug 2026
10.1038/s41598-026-66011-4
Adolescents’ status-dependent public and private conformity to prosocial and antisocial decisions in a public goods game
Niloofar Saeedi, Khatereh Borhani et al.
Aug 2026
10.1038/s41598-026-64831-y
An explainable hierarchical capsule network framework for supporting expert sensory evaluation of herbal medicines with natural language generation
Hyein Lee, Dae-Hyun Jung
Aug 2026
10.1038/s41598-026-64156-w