Sara M. Elseufy, Ayman Hussein, Mohamed Badawy. "A comprehensive framework for evaluating bridge project rework through earned value management (EVM) and building information modeling (BIM)." Scientific Reports (2026). https://doi.org/10.1038/s41598-025-27546-0