Multistage assessment of construction delay factors using expert evaluation and real project data

A Ahmed Eid A Ayman Halabya N Nabil M. Nagy A Abbas Atef Hassan

Abstract

Abstract Construction delays remain a major challenge, especially in developing countries where financial, administrative, and resource constraints intensify schedule disruptions. This study identifies and prioritizes construction delay factors through a three-phase research framework consisting of a literature review, an expert survey evaluation, and validation using real-life construction projects in Egypt. First, a comprehensive review of global literature led to the identification of 98 delay factors, which were classified into four main categories: owner-related factors (25 factors, 26%), contractor-related factors (34 factors, 35%), consultant/design-related factors (14 factors, 14%), and external factors (25 factors, 26%). Second, an expert survey was conducted to evaluate the previously identified delay factors. This phase employed a composite scoring approach that integrates both the frequency of occurrence and the impact of each factor to rank the most critical delay drivers. The findings indicate that owner-related factors constitute the most significant sources of delay, accounting for approximately 50% of the top 22 critical factors. Finally, the reliability of these findings was validated using the top 22 factors and a dataset of 141 real construction projects, showing strong alignment between the survey-based rankings and actual outcomes. Key factors, such as frequent change orders and design modifications, remained top-ranked, while some factors ranked higher or lower in practice, indicating minor variations in their relative importance under real project conditions. The study contributes a validated dataset of delay factors derived from both expert evaluation and real project evidence, providing a strong foundation for future predictive modeling applications using artificial intelligence and machine learning.

Article Details

Volume / Issue Vol. 16, Issue 1
Published May 25, 2026
ISSN 2045-2322
Publisher Nature Portfolio

Journal Info

Scientific Reports

Nature Portfolio

ISSN: 2045-2322 Open Access Life Sciences

Authors (4)

A

Ahmed Eid

A

Ayman Halabya

N

Nabil M. Nagy

A

Abbas Atef Hassan