Dawei Wang, Bo Gao, Lei Zhang. "Optimization on construction machinery considering sequence-dependent setup times and personnel fatigue based on the improved gray wolf and whale algorithm." PLoS ONE (2025). https://doi.org/10.1371/journal.pone.0320753