Wang, D., Gao, B., Zhang, L. (2025). Optimization on construction machinery considering sequence-dependent setup times and personnel fatigue based on the improved gray wolf and whale algorithm. PLoS ONE. https://doi.org/10.1371/journal.pone.0320753