Liang, Z., Peng, J., Zhao, C., Zhou, H., Li, D., Zhou, Y., Liu, Q., Li, X., Zhang, C., Wang, F. (2025). Modelling and simulation of the block pouring construction system considering spatial–temporal conflict of construction machinery in arch dams. Scientific Reports. https://doi.org/10.1038/s41598-025-09998-6