Qi Shi, Yue Le, Chunjie Gu, Yaming Geng. "Dynamic cost prediction of power technical transformation projects based on graph neural networks and multi-scale attention mechanisms." Scientific Reports (2026). https://doi.org/10.1038/s41598-026-60855-6