Jayson B. Ball, Maggie R. Finch, Jeremy A. Taylor, Zachariah Z. Smith, Igor Rafael Correia Rocha, Suzanne M. Green-Fulgham, Ethan B. Rowe, Joseph M. Dragavon, Connor J. McNulty, Renee A. Dreher, Imaad I. Siddique, Gavin Davis, Andrew M. Tan, Michael V. Baratta, Daniel S. Barth, Linda R. Watkins. "Caudal Granular Insular Cortex to Somatosensory Cortex I: A Critical Pathway for the Transition of Acute to Chronic Pain." Journal of Neuroscience (2026). https://doi.org/10.1523/jneurosci.1306-25.2025