Ball, J. B., Finch, M. R., Taylor, J. A., Smith, Z. Z., Rocha, I. R. C., Green-Fulgham, S. M., Rowe, E. B., Dragavon, J. M., McNulty, C. J., Dreher, R. A., Siddique, I. I., Davis, G., Tan, A. M., Baratta, M. V., Barth, D. S., Watkins, L. R. (2026). Caudal Granular Insular Cortex to Somatosensory Cortex I: A Critical Pathway for the Transition of Acute to Chronic Pain. Journal of Neuroscience. https://doi.org/10.1523/jneurosci.1306-25.2025