M. K. Soundarya, A. Logeshkumaran, P. R. Kalyana Chakravarthy, P. V. Elumalai, S. Baskar, J. Anil Reddy, S. Prabhakar, Liu Yu. "An investigation study on residential buildings for cost overrun." Scientific Reports (2025). https://doi.org/10.1038/s41598-025-95984-x