Soundarya, M. K., Logeshkumaran, A., Chakravarthy, P. R. K., Elumalai, P. V., Baskar, S., Reddy, J. A., Prabhakar, S., Yu, L. (2025). An investigation study on residential buildings for cost overrun. Scientific Reports. https://doi.org/10.1038/s41598-025-95984-x