Macdonald, E. E., Ma, J., Liu, D., Yu, K., Walker, R. A., Authement, M. E., Leng, Y., Goldbach, H. C., Li, G., Li, Y., Alvarez, V. A., Averbeck, B. B., Penzo, M. A. (2026). A synaptic mechanism for encoding the learned value of action-derived safety. Nature Communications. https://doi.org/10.1038/s41467-026-73906-3